Products Trial Report

 

 

 

Through the menu: Projects, Operational Management Reports submenu, the system allows obtaining the audit information through the Products Trail Report option.

 

 

 

The system allows filtering by Product: a product has to be selected from the drop down list on the screen. In this case, the products trail report will contain the information of the

product and the selected subproject.

 

 

 

Once the Subproject Code and filters have been selected, the user will click on Search button to generate a report.

If the user clicks on save icon and choose "Excel" the system will open the report in a Microsoft Office excel file, then the user will be able to print this file or save it in the computer.

The Products Trail Report has the following information:

 

Heading:

Warehouse

Protocol

Sponsor

Project Type

SubProject Code

 

Detail of columns:

Warehouse

Product Code and Description

Activity (Operation)

Quantity

Status of product

Position

Lot

Kit number

Expiry date

Site

Preconfirm User

Preconfirm Date

Verification User

Verification Date